Most E&P operators are challenged with finding cost-effective solutions for improving reservoir recovery factors. Well planned CSI can provide significant benefits such as increased production, and increased recovery factor. Additionally, the earlier an operator applies the method, the more likely they are to gain positive economic results. Field pilot can provide valuable knowledge on the feasibility and potential of CSI, reduce the full field deployment risks, and increase the operator’s knowledge about the process. DESHI can determine the best scenario before beginning a pilot, reduce cost overruns due to trial and error, and reduce the amount of time to positive net present value. The CSI method can offer high final oil recoveries when proper reservoirs are chosen, sound pilot designed, and execution excellence. DESHI can achieve this by acting as an integrated service provider with complete oversight of the entire process from visualization to evaluation of the pilot.